Zeytinburnu Drinkwater Transfer Tunnel Application Projects Designing
Scope of Work: TBM Tunnel which will be got through steel transmission line, designing of vertical shafts structure’s application projects
Administration: İstanbul Metropolitan Municipality, İSKİ İstanbul Water and Sewerage Administration
Hydraulic calculations was made, tunnel route and longitudinal section projects of tunnel were designed related with the drinkwater which is planning to be constructed on the purpose of providing the transmission to Bahçelievler, Güngören without affecting the existing steel transmission line’s superstructure with Ø1600 mm internal diameter at İstanbul Zeytinburnu district. Projects were designed by making the calculations related with the tunnel’s section which will be excavated by Tunnel Boring Machine (TBM) and vertical shaft structure.