Yeşilyurt Village Transit Between Saraydüzü-Boyabat
Task: Boyabat - Saraydüzü (Including Boyabat Transit) Road project Between Km:50+805- Km:71+167.
Management: KGM 7.Division Directorate
Contractor: Aydın İnşaat Taah. Tic. A.Ş.- Cengiz İnşaat San. Tic. A.Ş. Joint Venture
Project Scope: Within the Project scope, reinforced concrete retaining wall of the road’s cleaving and filling zone, bored pile, retaining structure projects as a masonry wall and underpass with a 96m length projects were prepared.