• image

Tosya Underpass Projects

Task: 4.Bl.Hl.- Ilgaz-Tosya- 7.Bl.Hd. (Between Ilgaz-Tosya) Km: 60+184.650 – 97+722.821 Survey, Design and Engineering Service

Management: KGM 15.Division Directorate
Contractor: Polat Yol Yapı San. ve Tic. A.Ş.
Project Scope: Survey, design services were provided for the intersections on 12 different locations all along the route. Subway and overpass bridge’s architecture and static projects were designed, which are located at these intersection zones.