Slope Stability Projects for Cermik and Saribudak Bridge piers at Artvin – Erzurum Road
Task: Project Engineering Service for Artvin – Erzurum State Road 1. Zone Construction Bridge-4 (Cermik Bridge) and Bridge-5 (Saribudak Bridge)
Administration:DSİ General Management’s Presidency of Dams and Hydroelectric Power Station Department
Constructor: NTF İnşaat Tic. Ltd. Şti.
Project Scope: Slope stability projects was made to abutment and pier of Bridge-4 (Cermik Bridge) and Bridge-5 (Saribudak Bridge), which are located on newly constructed Artvin - Erzurum State Highway. Due to Deriner Dam and Hydroelectric power station, current state road was submerged. Every projects had been confirmed by KGM and DSI.