Procter & Gamble Apollo Phase-II Project (Sekerpinar)
Total Covere Area: 2250 m²
Piperack Length: 264m
Intended Use: Production and Packaging Plant
Structural System: Steel+Reinforced concrete
Project Scope: Packing Building, Waste and Parfume Buildings, Ethenol and Ozone Buildings, Amenities Building, Making Area, Making Area Wall Systems, Paste, Amino and WB Tank Foundations, Machine Foundations and Piperack.
Every civil engineering, architectural, mechanical and electrical projects of packing plant, which was constructed within the storage building of Procter & Gamble Şekerpınar, were made by our company.
All components of civil engineering discipline were used for preventing the overlap and interaction of superstructures and foundations of new system which was constructed within the existing building.
While designing the pipeline bridges which intertwined with existed and new structures, every phases of construction, start up and maintenance were taken into consideration.
While designing Machinery-Equipment and Tank foundations, data that was sent by producing company, were evaluated carefully.