Karakuz Dam and Hydroelectric Power Plant (HES) Project Energy Tunnel Project Service

Scope of Work: Designing of application projects of 11.000m long tunnel wich will be bored with TBM for Energy Tunnel

Administration: Altek Alarko Enerji Santralları Tesis İşletme ve Ticaret A.Ş.

Within Karakuz dam and HES Project scope, by making precast segment lining structural analysis, precast segment reinforced concrete lining projects were designed for Energy Tunnel at 11.000 length Ø3100 mm internal diameter which will be bored with Tunnel Boring Machine (TBM)