• image

Karabiga Thermal Power Station

Project Scope: Transportation Road Project in the Thermal Power Station

Management: Energy Market Regulatory Authority 
Constructor: CENAL Elektrik Üretim A.Ş (Cengiz Holding A.Ş. & Alarko Holding A.Ş Joint venture)

A total of 454.518 m² in area, 1320 MWe (2X660 MWe) / 1380 MWm / 2926 MWt installed capacity, Road Projects in the Thermal Power Station has been prepared within scope of imported coal based power plant, pier, ash landfills, deep sea outfall projects’ construction and operation.