Azerbaijan, Baku-Azersu ASC, Dernegül Wastewater Tunnel Projecting Service
Scope of Work; Wastewater TBM Tunnel with 3.500 m lenght Ø2600mm external diameter, 4 main tunnel shafts with 9,00 m external diameter
Administration: Azərsu ASC (Açıq Səhmdar Cəmiyyəti)
This is one of the most important project regarding to wastewater decharge and treatment system of Azerbaijan-Baku. With the complement of the project, by transporting wastewater, which will be gathered from the broad-scale basin, to treatment units it will be provided Baku’s lakes and Caspian Sea to be reached the sustainable highest environmental standards.