Antalya Çamdağ Tunnel Rehabilitation Project
Task: Antalya - Kemer State Road (Km: 19 + 000 - 27 + 000 Zone) Çamdag Tunnel Survey, Design and Engineering Service
Management: KGM 13.Division Directorate
Project Scope: Two reinforced concrete portal structures and tunnel rehabilitation project were prepared for the 130m long tunnel by making engineering geology studies.